Monday, January 19th, 2026

Road on Nepal side damaged as Indian side carries on own construction blocking river


Time taken to read : 3 Minute


  • A
  • A
  • A

DARCHULA: The Nepali Army constructed a mule track by setting up its camp at the Maurabhel area of Byas Rural Municipality last year. The mule track linking Chhangru Tinker in Byas Rural Municipality-1 was disrupted in course of India’s construction of the road linking Mansarovar via Lipulek.

The road on Nepal side got damaged and blocked when a whole chuck the size of a hillock fell into the Mahakali river in course of the Indian construction.

India, time and again, continued setting off explosives on the other side of the Nepali Army camp across the Mahakali river while constructing the road. The Nepali Army had been constructing the mule track on the Nepal side. The blasting carried out by the Indian side hindered the construction of the road on Nepal side due to the falling of boulders, deposition of rock and rubble in the river as well as on the road on Nepal side.

The Mahakali river swept away the mule track constructed by the Army some 100 meters below the army camp.
Last Tuesday the trail at Kalju Simsimpani area at Byas Rural Municipality-2 was damaged when a large chunk of the side f a hill at Shantiban area collapsed in course of India’s expansion of the Dharchula Lipulek Mansarovar road.

Nearly over 250 meters of the mule track has been damaged in course of the India’s construction of its road. With this, the ward number 1 and 2 of Byas rural municipality have become disconnected, said Dhiran Singh Budhathoki, the Byas-2 Ward Chair.

India has been constructing the road linking Mansarobar from Dharchula via Lipulek since a decade back. This road goes along the bank of the Mahakali river and hence the increased possibility of the river getting blocked due to the falling boulders and rubble while carrying out blasting in course of the construction of the road.

Ward Chair Budhathoki said the Mahakali river has changed its course at several places as it gets blocked due to the deposition of large boulders and rocks.

Moreover, India has been constructing the road without leaving aside the no-man’s land, taking the equipment via the Nepal side. The Mahakali River forms the border between Nepal and India.

The Indian side has been digging the road in the territories above the Darchula district. “The river course has changed after pebbles have deposited into it as a result of digging the road 10 meters above the river. The river has eroded its banks and been advancing towards Nepal’s territories,” said Budhathoki.

Last year, Nepal’s territories in the Ghantibagar area were eroded after pebbles were deposited into the river as a result of digging roads by the Indian side.

Publish Date : 14 June 2021 22:11 PM

Kulman Ghising to contest from Kathmandu-3

KATHMANDU: Kulman Ghising, chairperson of the Ujyaalo Nepal Party, will

HoR polls: 167 polling stations set up in Parsa

PARSA: The District Security Committee of Parsa has classified 62

Nearly 9 million ballots printed for proportional polls

KATHMANDU: The Election Commission has printed a total of 8,917,000

Pentagon on expansionist plans of China: Beijing’s silence a sign of acquiescence

Beijing’s silence over a Pentagon report that Taiwan, Senkaku Islands

Congress finalizes candidates for 34 constituencies

KATHMANDU: Gagan Kumar Thapa, who became the president of the