Friday, October 25th, 2024

PM Oli inaugurates bridge at Kamal River in Jhapa


28 February 2021  

Time taken to read : < 1 Minute


  • A
  • A
  • A

JHAPA: Prime Minister KP Oli has inaugurated a concrete bridge at the Kamal River at Kamal Rural Municipality in Jhapa district Sunday.

The length of the bridge connecting Kampa Bazaar of the rural municipality to Dharampur of Shivasatakshi is 170 meters and the width is 11 meters.

The bridge has been constructed at a cost of Rs 166.264 million.

Meanwhile, Prime Minister Oli is also scheduled to lay a foundation stone of the China-Nepal Industrial Park, according to Hom Bahadur Thapa, a member of the Prime Minister’s Secretariat.

Prime Minister Oli is scheduled to lay the foundation stone of 31 bridges to be constructed on Madan Bhandari Highway today.

Publish Date : 28 February 2021 14:03 PM

NC President Deuba lauds govt’s 100-day performance

KATHMANDU: Nepali Congress (NC) President and former Prime Minister Sher

Couple found dead in Kanchanpur

KANCHANPUR: A couple was found dead early morning today in

PM Oli urges collective efforts to combat dengue

KATHMANDU: Prime Minister (PM) KP Oli has called upon all

34 industries face power cuts amid NEA line disputes

KATHMANDU: Kulman Ghising, Executive Director of the Nepal Electricity Authority

Kim Jong-un’s Anti-National Actions Cannot Suppress North Korean Soldiers’ Yearning for Freedom

Recently, Kim Jong-un not only proposed a “Two Hostile States