Thursday, November 12th, 2026

Durbar High School building handed over to school management



KATHMANDU: A building of Durbar High School reconstructed with support from the Government of China has been handed over to the school management today.

Though the reconstruction of the building was completed in the month of January, the process to handover the building was delayed due to the outbreak of coronavirus infection.

Min, the Project Manager on the behalf of China, handed over a bunch of keys of the school building to Chairpersons of School Management Committee, Gopal Maharjan and Prabha Bajracharya.

The school building is spread at nine and a half ropani of land near Ranipokhari in Kathmandu Metropolitan City-27. The school building was reconstructed with the full financial support from the Chinese government.

The four-storied building was reconstructed at the cost of Rs 850 million. The building has 40 rooms.

There are 350 students in the school.

The Gorkha earthquake had completely damaged the school building. The school was established during the tenure of the then Prime Minister Janga Bahadur Rana in 1910 BS to provide education to the children of Rana families.

The school was opened in 1964 BS to teach Sanskrit for children of the general public and the school started to teach other subjects in 2048 BS.

Publish Date : 08 September 2020 20:01 PM

Kathmandu Valley’s minimum temperature drops to 8 degrees Celsius

KATHMANDU: Temperatures in the Kathmandu Valley have continued to fall,

Food grain imports through Birgunj border decline by 63 percent

BIRGUNJ: Food grain imports through the Birgunj border point declined

Gosainkunda tourism picks up as road access improves

RASUWA: Tourist arrivals in Gosainkunda, a renowned religious and natural

When human suffering becomes social media content

KATHMANDU: What does it take to go viral on social

COP31 calls for stronger climate finance and disaster resilience

ANTALYA (TÜRKİYE): Senior officials at the 31st United Nations Climate