Sunday, November 29th, 2026

330 rescued from flood-hit Rasuwa as tunnel searches continue



RASUWA: Rescue operations for people affected by the Bhotekoshi River flood in Rasuwa have been intensified, with 330 people evacuated to safety by Nepal Army helicopters as of 1:30 pm on Monday.

The Nepal Army said technical and expert teams have been deployed to search for and rescue people believed to be trapped inside tunnels of hydropower projects damaged by the flood.

At the Trishuli-3 hydropower project, a rescue team has descended around 15 metres into the tunnel to conduct the search operation.

Similarly, an expert team from the Nepal Army has continued search and rescue efforts inside the tunnel of the Trishuli-3B (3G) hydropower project.

At the Rasuwa Gadhi Hydropower Project, a joint team of security personnel entered around 250 metres into the tunnel in search of missing people. However, no one was found and the team subsequently returned outside, according to the Nepal Army.

More than 8,900 Nepal Army personnel have been directly deployed in the flood-affected areas to coordinate and strengthen rescue operations.

According to the Shreenath Battalion of the Nepal Army, personnel are conducting search, rescue and relief operations along riverbanks, in mountainous areas and at the homes of local residents.

Publish Date : 31 August 2026 17:36 PM

Myanmar military air strikes kill dozens, targeting wedding venue, school and residential areas

NAYPYIDAW: Air strikes carried out by Myanmar’s military have killed

Minister Shrestha inspects flood-damaged areas in Myagdi and Parbat

MYAGDI: Minister for Energy, Water Resources and Irrigation Biraj Bhakta

NRB fixes foreign exchange rates for today

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign exchange

Weather conditions expected to remain fair today

KATHMANDU: Weather conditions across Nepal are expected to remain generally

Govt approves one-year extension for US-funded MCC projects in Nepal

KATHMANDU: The government has decided to extend the implementation period