Saturday, August 29th, 2026

Nepal Telecom restores services at Trishuli-3A site



KATHMANDU: Nepal Telecom has resumed its services through a tower located near the Trishuli-3A Hydropower Project in Rasuwa, facilitating communication for the ongoing rescue operation inside the project’s tunnel.

The tower was brought back into operation after the company transported the required generator and fuel to the site using its vehicles and by carrying them manually for nearly an hour. Nepal Telecom technicians conducted the necessary technical tests before restoring the service.

Similarly, the Tupche BTS site in Rasuwa has also resumed operation from Saturday.

Technicians reached the site by helicopter from Trishuli, carrying the generator and fuel required to operate the tower, and restored the service.

Services have resumed around the Trishuli-3B project site, Betrabati and parts of Kalikasthan through the restored Tupche BTS.

Publish Date : 29 August 2026 17:01 PM

NOC sends 40,840 litres of aviation fuel for flood rescue operations

KATHMANDU: Nepal Oil Corporation (NOC) has sent 40,840 litres of

Chinese embassy rejects claims of withholding flood warnings from Nepal

KATHMANDU: The Chinese Embassy in Nepal has clarified allegations that

Foreign Minister’s visit to Serbia cancelled

KATHMANDU: Minister for Foreign Affairs, Shisir Khanal, has cancelled his

Nepal Telecom restores services at Trishuli-3A site

KATHMANDU: Nepal Telecom has resumed its services through a tower

208 people, including 43 foreigners, rescued from Trishuli-3 tunnel

KATHMANDU: A total of 208 people, including 43 foreign nationals,