MAHENDRANAGAR: A budget of Rs 50 million has been requested for the reconstruction of the historic Dodhara Chandani suspension bridge over the Mahakali River, which was damaged by floods on September 30.
Movement across the bridge has been completely disrupted after one of its pillars was damaged by the flooding.
Shankar Budhathoki, planning chief of the Suspension Bridge Division, told the Rastriya Samachar Samiti (RSS) that Rs 50 million had been requested from the Ministry of Physical Infrastructure and Transport in the first phase for the reconstruction of the bridge, which connects Bhimdatta Municipality with Dodhara Chandani.
“A detailed cost estimate is yet to be prepared, as soil testing is required. However, the water current around the damaged section has prevented technicians from carrying out the tests,” Budhathoki said.
He added that other technical work would be carried out and the contract process initiated once the water level and current in the river subside.
A two-member technical team led by Kamal Kumar Adhikari, deputy director general of the Suspension Bridge Division, visited Kanchanpur to assess the damage. The team estimated that the bridge had suffered damage worth Rs 70 million, while approximately Rs 200 million would be required for its reconstruction and restoration of services.
According to the inspection team, besides the damaged pillar, two other pillars are also in a fragile condition and require repairs.
Meanwhile, the Sudurpaschim Province government has allocated Rs 10 million for the reconstruction of the Dodhara Chandani suspension bridge.
The bridge is not only an important transportation link between the two settlements but also a popular tourist attraction in the country.








Comment