Saturday, November 21st, 2026

Prithvi Highway to remain closed for five hours daily from today



KATHMANDU: Vehicular movement along various sections of the Prithvi Highway will be suspended for five hours daily, from 11 am to 4 pm, starting today (Saturday) to facilitate road maintenance and construction work.

According to Anil Thapa, Chief of the District Traffic Police Office, Chitwan, the traffic restriction has been imposed to facilitate construction work in the Ghoptebhir section of the highway.

“Vehicular movement along the Prithvi Highway will remain suspended from 11 am to 4 pm daily until further notice,” he said, adding that road maintenance and construction work is underway in Ghoptebhir and other sections.

Thapa said the duration of the daily traffic restrictions had not yet been determined.

During the construction period, vehicles travelling from Pokhara will be stopped at Aabukhaireni, while those coming via Narayangadh will be halted at Jugedi and Aanpatari. Some vehicles will also be stopped at Ralam Danda. However, vehicles will not be stopped at Muglin Bazaar, he added.

Publish Date : 21 November 2026 05:48 AM

Lumbini and Sudurpaschim set for NPL title showdown

KATHMANDU: Lumbini Lions and Sudurpaschim Royals will face off in

Kathmandu Valley’s minimum temperature drops to 8.3 degrees Celsius

KATHMANDU: The minimum temperature in Kathmandu Valley has declined further,

First Sunrise Tea Festival kicks off in Ilam today

ILAM: The two-day First Sunrise Tea Festival-2083 is beginning today

Trump threatens vetoes but signals willingness to work with Jeffries

WASHINGTON DC: US President Donald Trump on Friday (local time)

NRB announces foreign currency exchange rates for today

KATHMANDU: Nepal Rastra Bank (NRB) has announced the official foreign