Sunday, October 4th, 2026

SC restores old construction standards along riverbanks in Kathmandu Valley



KATHMANDU: The Supreme Court has reviewed its earlier order on construction permits along rivers and streams in the Kathmandu Valley and reinstated the previous building setback standards.

A full bench of Justices Sunil Kumar Pokharel, Balkrishna Dhakal, and Nripadhwaj Niraula issued the decision, allowing construction in accordance with the standards set on Mangsir 1, 2065 B.S.

According to the ruling, a 20-meter setback must be maintained from the banks of the Bagmati, Bishnumati, and Manohara rivers for construction activities.

In areas under project implementation along the Dhobikhola corridor, construction will be allowed based on approved planning, while in non-planned areas a 9-meter setback must be maintained.

Similarly, the court has mandated a 12-meter setback for the Nakkhu River, 10 meters for Balkhu, Karmanasa, Koike, Sale, and Mahadev rivers, 6 meters for Karkhusi, and 4 meters for Tukucha, Samakhusi, and other smaller streams.

The court has also clarified that no river, stream, or traditional water channel (rajkulo) should be encroached upon or covered under any circumstances.

Publish Date : 20 May 2026 20:06 PM

Phidim Municipality contributes Rs 4.7 million to disaster relief fund

PANCHTHAR: Phidim Municipality has contributed Rs 4.7 million to the

Gold and silver prices decrease in domestic market

KATHMANDU: The prices of gold and silver have declined in

UML Chair not to attend NC General convention

KATHMANDU: CPN-UML Chair KP Sharma Oli has decided not to

NC row: Deuba turns down Gagan’s invitation to convention

KATHMANDU: Former Nepali Congress (NC) President Sher Bahadur Deuba has

Trump says US will decide on Iran, either the “easy way or hard way”

WASHINGTON DC: US President Donald Trump on Saturday (local time)