Monday, September 14th, 2026

Temporary log bridge and ‘tuin’ installed over Phalakhu and Bhotekoshi rivers



RASUWA: A temporary log bridge and a tuin (cable crossing) have been installed over the Phalakhu and Bhotekoshi rivers along the Rasuwa-Nuwakot road section after floods destroyed the concrete bridges over both rivers, disrupting road connectivity.

Superintendent of Police Tul Bahadur Bhandari of the Armed Police Force said the alternative crossings were established to facilitate the movement of people in the affected areas.

A bamboo-and-wood bridge has been constructed at Betravati for pedestrians, while an iron-wire tuin has been installed at Syafrubensi. Although the tuin is operational, work is still underway to complete the footpaths on both sides, which is expected to be finished within a few days.

Province Assembly member Indra Prasad Gotame said travel from Nuwakot through Gerkhu, Chapatar and Keraghari to Betravati has become easier following the completion of the bridge there.

Social worker Ganesh Shrestha said the construction of the log bridge was supported by the Nepali Army, Nepal Police, Armed Police Force and local residents.

Publish Date : 14 September 2026 14:13 PM

PM Shah vows safe resettlement for Bhotekoshi flood victims

KATHMANDU: Prime Minister (PM) Balendra Shah (Balen) has said there

NC row: Deuba faction disagrees with party’s CWC decision

KATHMANDU: The faction led by former Nepali Congress (NC) President

Temporary log bridge and ‘tuin’ installed over Phalakhu and Bhotekoshi rivers

RASUWA: A temporary log bridge and a tuin (cable crossing) have been

Bhotekoshi flood causes over Rs 1 billion in agricultural losses

KATHMANDU: The agricultural sector suffered significant losses from the flash

Flash flood risk likely in 22 districts as rivers rise

KATHMANDU: Water levels in several major rivers are expected to