Saturday, December 6th, 2025

Drinking water facility reaches 400 households in Myagdi



MYAGDI: A total of 400 households in Malika Rural Municipality–3 of Myagdi have gained access to drinking water after the successful completion of three local water supply projects.

With support from Nepal Newa, cooperation from an external organization, and voluntary labor contributions from locals, water taps have been installed in individual homes—replacing the previous reliance on public taps.

According to Ward Chairman Moti Prasad Budha, 225 households in Dadagaun, Kiteni, Aul, Saragdi, and Syagalung, 122 in Patle, and 53 in Lumpipar have benefited from the projects.

The three drinking water projects, built at a total cost of Rs 21.4 million, were jointly inaugurated on Sunday by Malika Rural Municipality Chairman Beg Prasad Garbuja.

Bal Bahadur Roka, a local resident of Patle, shared that household chores have become easier and more efficient with direct access to water, saving both time and effort.

Each household contributed 50 to 60 days of labor for the construction. Dhan Bahadur Roka, secretary of the Patle Simul Drinking Water, Sanitation and Hygiene Consumers’ Association, said meters have been installed for efficient water use, and a concrete drying rack has also been built to maintain cleanliness around the taps.

Publish Date : 28 July 2025 09:54 AM

Authorities intensify market monitoring, takes action against eight firms

KATHMANDU: The Department of Commerce, Supplies and Consumer Protection has

‘Smart Road Lighting’ installed on main roads in Tokha

KATHMANDU: Smart road lighting has been installed along major roads

EC prepared for upcoming polls: Acting Chief Commissioner

KAHTMANDU: Acting Chief Commissioner of the Election Commission (EC) Ram

Four-hour power cut in key Kathmandu areas as NEA resumes underground line work

KATHMANDU: Nepal Electricity Authority (NEA) has announced scheduled power cuts

Kanti Highway to remain closed for maintenance from today

LALITPUR: Kanti Highway will remain closed for two months starting