Tuesday, June 2nd, 2026

Bheri–1 Hydropower Project to affect 124 households



KATHMANDU: The Environmental Impact Assessment (EIA) report for the proposed 270-megawatt semi-reservoir-based Bheri–1 Hydropower Project has been made public. The report was released by the Ministry of Forests and Environment.

The project, to be developed by Gezhouba Group Power Investment Nepal Pvt. Ltd., will utilize the flow of the Bheri River through Nalagadh Municipality (wards 10, 11, 12, and 13) in Jajarkot district and Aathbiskot Municipality (wards 4, 5, and 6) in Rukum (West) to generate electricity before releasing the water back into the Bheri River. It is based on a peaking run-of-river model.

According to the EIA report, the project will require a total of 24.075 hectares of national forest — 20.523 hectares from Jajarkot and 3.552 hectares from Rukum (West). A total of 252 trees will need to be felled for the project, including 202 from Jajarkot and 50 from Rukum (West).

The report also notes that the project will directly impact 124 households.

The estimated cost of the hydropower project is approximately Rs 71.97 billion.

Publish Date : 27 May 2025 15:14 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

33 SSPs transferred; Kathmandu and Lalitpur police chiefs replaced

KATHMANDU: The Nepal Police has transferred 33 Senior Superintendents of

DDA directs immediate recall of Calcium and Vitamin D3 medicine over quality concerns

KATHMANDU: The Department of Drug Administration (DDA) has instructed the

US sees Nepal as key partner, vows to deepen bilateral cooperation: Sarah B. Rogers

KATHMANDU: United States Deputy Secretary of State for Public Diplomacy

Chief Justice issues 21-point directive to strengthen judicial performance

KATHMANDU: Chief Justice Manoj Kumar Sharma has issued a 21-point