Wednesday, June 17th, 2026

Landslide at Twin Khola being cleared under lights, road to open tonight



CHITWAN: Traffic along the Narayangadh–Muglin road section is expected to resume tonight after authorities cleared most of the landslide debris near Twin Khola bridge in Ichchhakamana-5, Chitwan.

According to the Chitwan Road Division, six heavy machines, including excavators and loaders, are working simultaneously at the narrow landslide site. To speed up operations, lights have been installed to allow work to continue through the night. Officials aim to reopen the highway to vehicles from both Narayangadh and Muglin sides by 9 p.m.

Progress had initially been slower than expected due to large boulders and sharp rocks, which increased risks of tire punctures and injuries to operators. Despite the challenges, operators have been working around the clock, enabling the debris to be cleared sooner than anticipated.

Once reopened, the vital road link is expected to ease traffic disruptions in the busy corridor connecting Kathmandu with western Nepal.

Publish Date : 25 September 2025 20:47 PM

Nagdhunga Tunnel set to open for traffic from next month

KATHMANDU: Preparations are underway to bring the Nagdhunga-Naubise Tunnel into

Messi magic lights up World Cup as Argentina crush Algeria

MISSOURI: Some legends age like fine-wine and Argentine superstar Lionel

National grid lights up world-renowned ABC trekking route

KASKI: Trekking along the world-renowned Annapurna Base Camp (ABC) trail

Pipeline installation begins to expand Melamchi water distribution

KATHMANDU: Work has begun on laying 1,800-mm-diameter transmission pipes in

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of