Thursday, March 19th, 2026

Landslide at Twin Khola being cleared under lights, road to open tonight



CHITWAN: Traffic along the Narayangadh–Muglin road section is expected to resume tonight after authorities cleared most of the landslide debris near Twin Khola bridge in Ichchhakamana-5, Chitwan.

According to the Chitwan Road Division, six heavy machines, including excavators and loaders, are working simultaneously at the narrow landslide site. To speed up operations, lights have been installed to allow work to continue through the night. Officials aim to reopen the highway to vehicles from both Narayangadh and Muglin sides by 9 p.m.

Progress had initially been slower than expected due to large boulders and sharp rocks, which increased risks of tire punctures and injuries to operators. Despite the challenges, operators have been working around the clock, enabling the debris to be cleared sooner than anticipated.

Once reopened, the vital road link is expected to ease traffic disruptions in the busy corridor connecting Kathmandu with western Nepal.

Publish Date : 25 September 2025 20:47 PM

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

‘Extensive damage’ reported at Qatar industrial site amid Iran’s retaliation for gas field strike

QATAR: Qatar’s state-owned petroleum company has reported “extensive damage” at

Kathmandu valley records initial minimum temperature of 10.8°C

KATHMANDU: The initial minimum temperature of the Kathmandu Valley was

EC to distribute certificates to PR lawmakers today

KATHMANDU: The Election Commission (EC) is distributing certificates to candidates

Nepali Congress President Gagan Thapa steps down

KATHMANDU: Nepali Congress (NC) President Gagan Thapa has resigned from