Friday, January 9th, 2026

Sonapur Mineral pays first installment of outstanding premium tariff, power supply restored



DANG: Sonapur Mineral and Oil Pvt. Ltd., operating in Ghorahi, Dang, has cleared the first installment of its outstanding premium tariff dues for electricity consumed through dedicated and trunk lines during the load-shedding period.

Following the payment, the company’s disconnected power line was reconnected on Tuesday evening.

According to Nepal Electricity Authority (NEA), Sonapur Mineral has paid the first installment covering charges from January 2016 to April 2018. The company had an outstanding balance of Rs 242.9 million, which has been divided into 28 installments.

Sonapur has paid Rs 8.63 million as the first installment, enabling the reconnection of its electricity supply.

Publish Date : 12 November 2025 11:02 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Fire destroys property worth Rs 13 million in Jhapa

JHAPA: Property worth approximately Rs 13 million was destroyed in

HoR election: EC to monitor social media to curb fake news and misinformation

KATHMANDU: The Election Commission (EC) has pledged to curb the

Damauli-Keshavtar road blacktopped

TANAHUN: The road to Keshavtar, located 14 kilometers from the

Kathmandu temperature drops to 2.4°C

KATHMANDU: As temperatures continue to fall across Nepal, the minimum