Tuesday, December 16th, 2025

Kaligandaki Corridor: 14 kilometers of Rahughat–Tatopani section blacktopped



KALIGANDAKI: Under the Myagdi-Beni-Jomsom-Korala road project, 14 kilometers of the Rahughat–Tatopani section of the Kaligandaki Corridor have been blacktopped.

A contract was signed in 2074 BS with a construction company to blacktop a 19-kilometer stretch of road from Rahughat in Raghuganga Rural Municipality-3 to Bhurung Tatopani in Annapurna Rural Municipality-2, Nagdhunga.

According to the construction company, the completed 14-kilometer section includes Rahughat–Baisari–Kunauta–Begkhola–Kaliodar–Tiplyang–Mahabhir–Bhirkate–Ghar, and Baisari–Ratopani–Pokharebagar–Bhurung Tatopani.

The road was blacktopped after being widened to 11 meters, with supporting infrastructure such as drainage systems and retaining walls constructed to ensure water management and road stability.

The Kaligandaki Corridor is a 435-kilometer highway, of which the 202-kilometer stretch from Maldhunga in Parbat to Korala in Mustang via Myagdi is being developed as a two-lane road.

Blacktopping began in the fiscal year 2073/74, and the project has so far achieved 85 percent physical progress.

Publish Date : 02 May 2025 11:43 AM

Govt’s capital expenditure weak in first five months of FY 2025/26

KATHMANDU: The government’s development spending has remained weak in the

NEPSE gains 18.37 points, closes at 2,619.99

  KATHMANDU: The Nepal Stock Exchange (NEPSE) index rose by

Technical glitches delay voting at UML General Convention

KATHMANDU: Voting at the ongoing General Convention of the CPN-UML

Will OpenAI be the next tech giant or next Netscape?

KATHMANDU: Three years after ChatGPT made OpenAI a household name

Shekhar Koirala meets NC President Deuba to discuss membership distribution, disciplinary actions

  KATHMANDU: Nepali Congress (NC) leader Dr. Shekhar Koirala met