Thursday, December 25th, 2025

Hydraulic cable failure strands Chandragiri cable car passengers



KATHMANDU: A hydraulic cable failure at the Chandragiri Cable Car stranded thousands of passengers on Monday, forcing the service to shut down from 2:30 PM.

The disruption left over a thousand visitors stuck at Chandragiri Hills.

According to Metropolitan Police Circle, Thankot, 22 cable car cabins were immobilized. Emergency systems were used to rescue passengers from the lower station, but those at the upper station faced significant delays.

A police official reported that the issue had not been resolved as of Monday evening, with repairs on the broken hydraulic cable still underway.

Publish Date : 30 December 2024 19:35 PM

Gold, silver prices dip after hitting record highs

KATHMANDU: Gold and silver prices declined on Thursday, retreating from

Trade fairs and festivals boost economy and tourism: FNCCI President Dhakal

BANKE: President of the Federation of Nepalese Chambers of Commerce

Prachanda’s secretariat denies reports of electoral alliance talks with RSP Chair Rabi Lamichhane

KATHMANDU: The secretariat of Nepali Communist Party (NCP) Coordinator Pushpa

Exports via Birgunj surge 89 percent in first five months of current fiscal year

KATHMANDU: Goods worth Rs 39.97 billion were exported through the

Nepali Congress central committee meeting continues today

KATHMANDU: The Nepali Congress Central Working Committee meeting is continuing