Monday, December 22nd, 2025

Hydraulic cable failure strands Chandragiri cable car passengers



KATHMANDU: A hydraulic cable failure at the Chandragiri Cable Car stranded thousands of passengers on Monday, forcing the service to shut down from 2:30 PM.

The disruption left over a thousand visitors stuck at Chandragiri Hills.

According to Metropolitan Police Circle, Thankot, 22 cable car cabins were immobilized. Emergency systems were used to rescue passengers from the lower station, but those at the upper station faced significant delays.

A police official reported that the issue had not been resolved as of Monday evening, with repairs on the broken hydraulic cable still underway.

Publish Date : 30 December 2024 19:35 PM

MCA-Nepal signs contracts worth USD 23.7 million for road maintenance under MCC Compact

KATHMANDU: MCA-Nepal has signed two major contracts worth approximately USD

Elections will be held on time, assures Prime Minister Karki

KATHMANDU: Prime Minister Sushila Karki has called on all political

Imports rise 15.83% to Rs 766.18 billion in five months; exports jump 58.17%

KATHMANDU: Nepal’s merchandise imports increased by 15.83 percent in the

High-level commission begins work on transport sector reforms

KATHMANDU: A high-level commission formed by the government to investigate

Technical, scientific study underway on newly discovered Kajin Sara Lake in Manang

MANANG: A newly discovered lake named Kajin Sara Lake has