Friday, April 17th, 2026

Balambu Flyover: A solution for Valley traffic congestion (Pics)



KATHMANDU: A flyover is under construction at Balambu in Kathmandu, designed to connect the Kathmandu-Nagadhunga-Naubise Tunnel with Tribhuvan Rajpath.

This project aims to alleviate traffic jams caused by vehicles turning from Rajpath to tunnel.

The flyover will be 128 meters long and 7 meters wide, ensuring smooth traffic flow for vehicles entering and exiting the valley.

The 2,667-meter-long Balambu-Sisnekhola tunnel has already been completed.

Within a year, construction of the tunnel was finished, and it is now ready for vehicles to use.

Publish Date : 30 October 2024 13:49 PM

Israel and Lebanon enter ceasefire as Trump signals possible Iran talks

WASHINGTON DC: A 10-day ceasefire between Israel and Lebanon came into

House committee chair elections taking place today

KATHMANDU: Elections for the chairs of thematic committees under the

One killed in truck accident

DAMAULI: One person died in a truck accident at Bimalnagar

Mother’s Day being observed in Nepal today

KATHMANDU: Mother’s Day, also known as Matatirtha Aunsi, is being

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of