Thursday, December 25th, 2025

Balambu Flyover: A solution for Valley traffic congestion (Pics)



KATHMANDU: A flyover is under construction at Balambu in Kathmandu, designed to connect the Kathmandu-Nagadhunga-Naubise Tunnel with Tribhuvan Rajpath.

This project aims to alleviate traffic jams caused by vehicles turning from Rajpath to tunnel.

The flyover will be 128 meters long and 7 meters wide, ensuring smooth traffic flow for vehicles entering and exiting the valley.

The 2,667-meter-long Balambu-Sisnekhola tunnel has already been completed.

Within a year, construction of the tunnel was finished, and it is now ready for vehicles to use.

Publish Date : 30 October 2024 13:49 PM

Oli calls for Parliament’s reinstatement before elections

KATHMANDU: CPN-UML Chair KP Sharma Oli has reiterated that the

Biplav calls for street protests to pressure formation of all-party government

KATHMANDU: CPN (Maoist) General Secretary Netra Bikram Chand ‘Biplav’ has

Over 16,300 students conferred at TU’s 51st Convocation

KATHMANDU: Tribhuvan University (TU) today held its 51st convocation, conferring

Sudan Gurung says rooms locked until Rabi and Balen agree to work together

KATHMANDU: Sudan Gurung on Thursday said he has locked the

Sudan Gurung joins Balen-Rabi talks for possible political collaboration

KATHMANDU: As talks continue between Rastriya Swatantra Party Chairman Rabi