Wednesday, March 4th, 2026

Balambu Flyover: A solution for Valley traffic congestion (Pics)



KATHMANDU: A flyover is under construction at Balambu in Kathmandu, designed to connect the Kathmandu-Nagadhunga-Naubise Tunnel with Tribhuvan Rajpath.

This project aims to alleviate traffic jams caused by vehicles turning from Rajpath to tunnel.

The flyover will be 128 meters long and 7 meters wide, ensuring smooth traffic flow for vehicles entering and exiting the valley.

The 2,667-meter-long Balambu-Sisnekhola tunnel has already been completed.

Within a year, construction of the tunnel was finished, and it is now ready for vehicles to use.

Publish Date : 30 October 2024 13:49 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Temporary polling centre at Kathmandu DAO

KATHMANDU: A temporary polling centre has been set up at

13 charged over arson and vandalism at government offices during Gen-Z protest

KATHMANDU: The Kathmandu District Government Attorney’s Office has filed a

HoR election: 95 political parties sought clarification for code violation

KATHMANDU: The Election Commission (EC) has sought clarifications from 95

US Closes Embassies in Several Arab Countries Amid Escalating Regional Tensions

WASHINGTON: The United States has shut down several of its