Thursday, December 25th, 2025

Balambu Flyover: A solution for Valley traffic congestion (Pics)



KATHMANDU: A flyover is under construction at Balambu in Kathmandu, designed to connect the Kathmandu-Nagadhunga-Naubise Tunnel with Tribhuvan Rajpath.

This project aims to alleviate traffic jams caused by vehicles turning from Rajpath to tunnel.

The flyover will be 128 meters long and 7 meters wide, ensuring smooth traffic flow for vehicles entering and exiting the valley.

The 2,667-meter-long Balambu-Sisnekhola tunnel has already been completed.

Within a year, construction of the tunnel was finished, and it is now ready for vehicles to use.

Publish Date : 30 October 2024 13:49 PM

Balen Shah holds talks with Nepali Congress leaders ahead of March 5 elections

KATHMANDU: Kathmandu Metropolitan City Mayor Balen Shah has intensified political

Balen intensifies talks to forge alternative political force as March 5 election nears

KATHMANDU: With the March 5 House of Representatives election drawing

Bethlehem marks first festive Christmas since Gaza war

BETHLEHEM: Hundreds of worshippers gathered at the Church of the

Preliminary voter list published for National Assembly election

KATHMANDU: The Election Commission has published the preliminary voter list

Gold, silver prices dip after hitting record highs

KATHMANDU: Gold and silver prices declined on Thursday, retreating from