Tuesday, May 12th, 2026

Road Division directs KMC to reconstruct demolished roads at New Road within two days



KATHMANDU: The Road Division Office has instructed the Kathmandu Metropolitan City (KMC) to complete the reconstruction of roads demolished in the New Road area within two days.

The Office has also accused the KMC of demolishing the roads without obtaining proper permission.

In a letter addressed to the KMC, the Office issued a directive to reconstruct the road from Juddha Statue to Indra Chowk within the specified timeframe.

According to reports, the KMC had informed the Road Division Office about the demolition of the road section to extend the footpath before initiating the demolition.

However, the Road Division maintains that although the notice was received, permission was not granted to proceed with the demolition.

Publish Date : 30 May 2024 18:07 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Over 146,000 students remain non-graded in SEE results

KATHMANDU: More than 146,000 students who appeared in this year’s

Here’s how students can check SEE results

KATHMANDU: The results of the Secondary Education Examination (SEE) have

PMO says PM Balen Shah briefly left Parliament due to health discomfort

KATHMANDU: The secretariat of Prime Minister Balen Shah has clarified

Jagdish Kharel challenges allegations, vows to quit politics if link to Smart Telecom proven

KATHMANDU: Former Minister for Communications and Rastriya Swatantra Party (RSP)