Wednesday, September 30th, 2026

Long wait for resumption of iron ore mine in Parbat



PARBAT: The long closure of the iron ore mine in Mahashila rural municipality-6, Parbat, has left the local residents disappointed.

The mine has been inoperative since the year 2007 BS, and locals express dissatisfaction with the apparent lack of concern from relevant authorities regarding the reopening of the mine.

Despite a three-year effort by a squad from the Department of Mines and Geology in Lainchaur to excavate the mine, there has been no significant progress reported so far.

During their study, the team of geologists used electrical resistivity technology and discovered a substantial presence of iron ore in various locations—some on the surface and some beneath the earth. The ore mine spans an area of two kilometers.

Local youth, Jeevan Bikram Uchchai, said that there seems to be a lack of priority for further exploration of the mine.

The Department and Nepal Parbat Ore Mine Industry on 23 December, 2010 explored ways to resuming the mine’s operation. The mine is situated 40 kilometers away from the district headquarters Kushma Bazar.

The rural municipality has shown its interest in operating the mine lately. Locals share that the implements made from the iron extracted from this mine 73 years ago could be bought and seen in use even until 1984.

According to the elders, unlike the iron ore mined in other places the iron ore found here does not need to be refined. The ore extracted from the mine can be directly melted to manufacture the different tools and ware.

Prem Bahadur Sunar, a local, said the extraction was stopped at the mine later for lack of coal supply.

The home-made implements manufactured using the iron extracted from this mine used to be sold in various villages in Baglung, Palpa and Syngja among other districts.

The iron used in the cables for building bridges over the rivers in Parbat and surrounding places also came from this iron mine. The bridges using the cables made out of iron from this mine can still be seen at Modibeni and Jaimini Ghat.

It is said that around 400 households used to eke out a living extracting iron ore from this mine and selling it until five decades back.

The ward chair BK said the village itself is named Phalam Khani (iron mine) owing to the large number of iron mines throughout the village.

According to him, operation of the mine here would contribute to the country’s economy and scores of youths will get employment. “We are compelled to use imported iron and steel due to the inability to operate the mine that is eight at our doorstep,” lamented Bal Bahadur Chhetri, a local.

According to him, although several efforts were made at the initiatives of the then District Development Committee 20 years back for operating the mine here after consulting with the central government and various geologists and mines experts, these efforts were not successful.

RSS

Publish Date : 29 January 2024 21:25 PM

PM Shah discusses post-flood rehabilitation with lawmakers from engineering backgrounds

KATHMANDU: Prime Minister (PM) Balendra Shah held a two-hour discussion

RSP to reach all municipalities in local election campaign from Oct 6

KATHMANDU: The Rastriya Swatantra Party (RSP) is set to begin

Finance Committee directs govt to introduce Securities Bill

KATHMANDU: The Finance Committee of the Federal Parliament has directed

Efforts underway to drain lake formed after Marsyangdi River blockage

MANANG: Efforts are underway to drain a lake formed after

Nepal elected AIIB vice-chair as Finance Minister Wagle returns home

KATHMANDU: Finance Minister Dr Swarnim Wagle has returned to Nepal