Friday, September 11th, 2026

Dry port in Rasuwa 72 % complete



KATHMANDU: Construction of the dry port in Timure, Rasuwa, located near Nepal’s northern border with China, is 72 percent complete, according to Ashish Gajurel, Executive Director of the Nepal Intermodal Transport Development Committee.

Gajurel provided the update after an on-site inspection of the project, which is being built with financial and technical support from the Chinese government.

Key infrastructure developments have already taken shape. A 700-meter-long, 5.5-meter-high cement embankment has been constructed along the Bhotekoshi inlet.

Additionally, the port’s auxiliary roads, dredging works, and two warehouse buildings have been completed.

The dry port is designed to streamline trade and logistics, offering facilities such as a joint inspection site, additional warehouse buildings, and parking for 300 freight trucks and 100 smaller vehicles.

Construction is progressing with the aim of finishing by July 2025, Gajurel said.

The Timure dry port is expected to enhance cross-border trade between Nepal and China, providing modern infrastructure for efficient transportation and customs operations.

Publish Date : 27 December 2024 15:47 PM

132 students displaced by Bhotekoshi floods enrolled in school

KATHMANDU: A total of 132 students displaced by the recent

Rs 15 million assistance announced for treatment of Bhotekoshi flood victims

KATHMANDU: USV Pharmaceuticals has announced financial assistance of Rs 15

Madhesi Commission submits annual report to President

KATHMANDU: The annual report of the Madhesi Commission for fiscal

HoR business schedule set until Oct 1

KATHMANDU: The Business Advisory Committee of the House of Representatives

PM Shah pledges stronger govt-private sector cooperation

KATHMANDU: Prime Minister (PM) Balendra Shah has pledged to strengthen cooperation with the private sector