Wednesday, August 26th, 2026

Steel Truss bridge over Tila River



JUMLA: A motorable steel truss bridge has been constructed over the Tila River located in Tila Rural Municipality-1.

After the construction of the bridge, ward nos 6, 7, 8 and 9 of the Municipality have been connected to the road network.

Ward Chair of Tila-6 Janga Bahadur Rokaya said that after the operation of the bridge 13 villages of the rural municipality have been connected to the national road network.

It will be easy to transport daily consumables as well.

Roads in the rural areas of ward had become useless for lack of bridge over the river.

Passenger vehicles are no longer compelled to take the dangerous journey.

After the bridge came into operation transportation services will reach the village.

Motilal Rokaya, Chair of Tila Rural Municipality shared that this will be a huge relief for the local residents.

The road division office said that the bridge was constructed at the cost of Rs 140 million. The bridge is eight meters wide and

Publish Date : 26 October 2024 12:42 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Rasuwa Floods affect 10 percent of Nepal’s electricity capacity

KATHMANDU: The floods in the Bhotekoshi River in Rasuwa have

Govt coordinating for relief and rescue at national and international levels: Foreign Minister

KATHMANDU: Foreign Minister Shishir Khanal has expressed sorrow over the

Rescue, search and security top priority: PM Shah

KATHMANDU: Prime Minister (PM) Balendra Shah has said the government’s

Rasuwa flood: 403 tourists missing, majority foreign nationals

KATHMANDU: As many as 403 tourists have gone missing following