Sunday, December 14th, 2025

Steel Truss bridge over Tila River



JUMLA: A motorable steel truss bridge has been constructed over the Tila River located in Tila Rural Municipality-1.

After the construction of the bridge, ward nos 6, 7, 8 and 9 of the Municipality have been connected to the road network.

Ward Chair of Tila-6 Janga Bahadur Rokaya said that after the operation of the bridge 13 villages of the rural municipality have been connected to the national road network.

It will be easy to transport daily consumables as well.

Roads in the rural areas of ward had become useless for lack of bridge over the river.

Passenger vehicles are no longer compelled to take the dangerous journey.

After the bridge came into operation transportation services will reach the village.

Motilal Rokaya, Chair of Tila Rural Municipality shared that this will be a huge relief for the local residents.

The road division office said that the bridge was constructed at the cost of Rs 140 million. The bridge is eight meters wide and

Publish Date : 26 October 2024 12:42 PM

Nepal to send two elephant calves to Qatar

CHITWAN: Two elephant calves born at the Elephant Breeding and

NC Acting President Khadka calls emergency meeting of Nepali Congress CWC

KATHMANDU: The Nepali Congress (NC) has called an emergency meeting

Contracts will be cancelled if work remains unfinished: Minister Ghising

TANAHUN: Minister for Physical Infrastructure and Transport Kulman Ghising has

UML General Convention: Closed session set to begin to elect new leadership

KATHMANDU: A closed session of the 11th General Convention of

Astalaxmi Shakya and Yubaraj Gyawali to step down from UML Central Committee

KATHMANDU: UML Vice Chairs Astalaxmi Shakya and Yubaraj Gyawali have