Thursday, December 25th, 2025

Steel Truss bridge over Tila River



JUMLA: A motorable steel truss bridge has been constructed over the Tila River located in Tila Rural Municipality-1.

After the construction of the bridge, ward nos 6, 7, 8 and 9 of the Municipality have been connected to the road network.

Ward Chair of Tila-6 Janga Bahadur Rokaya said that after the operation of the bridge 13 villages of the rural municipality have been connected to the national road network.

It will be easy to transport daily consumables as well.

Roads in the rural areas of ward had become useless for lack of bridge over the river.

Passenger vehicles are no longer compelled to take the dangerous journey.

After the bridge came into operation transportation services will reach the village.

Motilal Rokaya, Chair of Tila Rural Municipality shared that this will be a huge relief for the local residents.

The road division office said that the bridge was constructed at the cost of Rs 140 million. The bridge is eight meters wide and

Publish Date : 26 October 2024 12:42 PM

Pradeep Paudel to contest for General Secretary Post

KATHMANDU: Nepali Congress leader and former minister Pradeep Paudel has

Bishwa Prakash to not contest upcoming election

KATHMANDU: Nepali Congress General Secretary Bishwa Prakash Sharma has announced

Three foreigners arrested with 4.3 kg of cocaine in Kathmandu

KATHMANDU: Police have arrested three foreign nationals in possession of

Private airlines suspend Pokhara–Jomsom flights amid winter slowdown

KATHMANDU: Private airlines have temporarily suspended flights on the Pokhara–Jomsom

Kulman: Ujyalo Party will lead nation’s transformation through elections

KATHMANDU: Patron of the Ujyalo Nepal Party and Minister for