Sunday, February 23rd, 2025

Distribution of drinking water from Sundarighat resumes


25 October 2024  

Time taken to read : 2 Minute


  • A
  • A
  • A

KATHMANDU: Distribution of drinking water has resumed from Sundarighat of Kirtipur, Kathmandu after the direction of Minister for Water Supply, Pradeep Yadav.

Supply of drinking water was halted after the flood following the incessant rainfall occurred on September 27 and 28 swept away pipelines along with sources.

Tripureshwor branch chief of Kathmandu Upathyaka Khanepani Limited (KUKL), Suman Bahadur Basnet, said that drinking water distribution has resumed from today after water of Nakkhu rivulet in Lalitpur brought to Water Treatment Plant, Sundarighat, on Thursday.

“We have become successful to bring water to Sundarighat Water Treatment Plant after carrying out repair and maintenance of sources damaged by the flood”, he mentioned.

The water would be distributed in various areas including Balkhu, Teku, Sabal Bahal today.

Chief Executive Officer of KUKL, Ashok Poudel shared that drinking water would be distributed as per the schedule from Saturday.

The flood and landslide occurred on last week of September had damaged 525 drinking water project across the country.

Minister Yadav said that repair and maintenance of these drinking water projects have started.

Publish Date : 25 October 2024 15:52 PM

RPP Chair Lingden urges immediate halt to Taplejung Cable Car project

KATHMANDU: Rajendra Lingden, Chairman of the Rastriya Prajatantra Party (RPP), has

Musk orders US federal workers to describe what they did at work last week or get fired

WASHINGTON DC: Elon Musk, the billionaire head of the Trump

Ghulam Ali performing in Nepal

KATHMANDU: Famous Pakistani ghazal singer Ghulam Ali is set to

Light rain likely in Koshi, Bagmati, and Gandaki provinces

KATHMANDU: Light rain, accompanied by thunder and lightning, is expected

Today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank has fixed the exchange rates for