Sunday, April 13th, 2025

Flood-fed Melamchi sweeps away temporary bridge


24 June 2024  

Time taken to read : < 1 Minute


  • A
  • A
  • A

SINDHUPALCHOWK: The flood triggered by incessant rainfall last night has taken away a temporary bridge in Melamchi.

Melamchi Municipality Mayor Aitaman Tamang said that a temporary bridge has been washed away at Fatte of Melamchi Municipality-11.

The temporary bridge was constructed by installing a hum pipe at the site after the flood in 2078 BS washed away the bridge.

The temporary bridge was connected to Melamchi bazaar and Melamchi municipality ward No. 7 and 8, Panchpokhari Thangpal rural municipality ward No. 1 and 2 and some wards of Helambu.

Due to the bridge being washed away, it has become difficult to go from one place to another within the ward.

According to Mayor Tamang, the bridge has been damaged due to the rain at night with the onset of rain.

Publish Date : 24 June 2024 11:03 AM

SC seeks statement of clarification on High Court’s order to detain Rabi Lamichhane

KATHMANDU: The Supreme Court (SC) has requested a clarification report

Hearing concludes in Rabi Lamichhane’s case, verdict awaited

KATHMANDU: The Supreme Court has concluded the hearing on the

Deadline approaches for foreign social media platforms to register in Nepal

KATHMANDU: Foreign social media platforms, including Facebook, have yet to

T20I: Nepal misses out on title after narrow loss to Kuwait

KATHMANDU: Nepal came agonizingly close to winning the four-nation T20I

Five local levels in Banke sans fire engines

BANKE: Five out of the eight local levels in Banke