Saturday, November 23rd, 2024

Kulekhani-Sisneri road opens


21 October 2024  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KULEKHANI: Vehicular movement along the Kulekhani-Sisneri road section which connects Kathmandu to Hetauda has opened from today.

Two-way traffic resumed from today after completing the maintenance works at Simkhola of Indrasarovar Rural Municipality-2 in Makawanpur district, Deputy Superintendent of Police (DSP) of Makawanpur Shyamu Aryal said.

The road was shut for three days to carry out the maintenance works and fix hume pipes at Simkhola.

The road was damaged after the flooding and landslides following the downpour in the last week of September.

Publish Date : 21 October 2024 09:14 AM

PM Oli holds virtual talks with Elon Musk

KATHMANDU: Prime Minister (PM) KP Oli engaged in a virtual

Light snowfall likely in high hilly areas today

KATHMANDU: The weather today is expected to be partly to

Today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank has published today’s exchange rates for

NC’s strategy with UML: Collaboration in govt, competition in field

KATHMANDU: The ruling Nepali Congress (NC) has instructed local working

Today’s news in a nutshell

Khabarhub brings you a glimpse of major developments of the