Friday, December 20th, 2024

Muglin-Naubise road to be closed for 3 hours a day for a week


20 December 2024  

Time taken to read : 2 Minute


  • A
  • A
  • A

KATHMANDU: The Muglin-Naubise road section along the Prithvi Highway will be partially closed for a week starting Sunday afternoon to allow for road improvements, including rock wall cutting at Pokharevhir and Bishaltar.

The road will be closed for three hours each day, from 11 am to 2 pm from December 22 to 28. The work is part of efforts to improve the road’s safety and accessibility.

Engineer Vijay Darai of the Nagdhunga-Muglin Road Project West Section said that heavy vehicles entering Gajuri from Naubise will be halted at Galchhi-Baireni, while light vehicles will be stopped at Jarekhet.

Similarly, heavy vehicles from Chitwan heading to Naubise will be stopped at Chalise, with light vehicles halted at Ghatbesi.

For the Bishaltar bend improvement, heavy vehicles entering Malekhu from Muglin will be stopped at Majhimtar, and light vehicles will be stopped at Charaundi Bazaar.

Vehicles heading from Malekhu to Muglin will be stopped at Benighat Bazaar for heavy vehicles and at Bishalaltar for light vehicles.

However, ambulances and security vehicles will be allowed to pass without interruption.

Publish Date : 20 December 2024 11:48 AM

Nepali Army defuses IED in Bhairahawa

RUPANDEHI: The Nepali Army deactivated a ‘pressure cooker bomb’, an

Dr. Koirala dismisses speculations of bitterness with Deuba

KATHMANDU: Nepali Congress (NC) leader Dr. Shekhar Koirala has dismissed

Dr. Lohani appointed VC of Nepal University

KATHMANDU: Dr. Bindu Nath Lohani has been appointed as the

Foreign Minister asks India for additional air routes for Pokhara and Lumbini airports

KATHMANDU: Foreign Minister Dr Arzu Rana Deuba has called for

Bangladesh beats Nepal to reach U-19 Women’s Asia Cup Final

KATHMANDU: Bangladesh defeated Nepal to secure a spot in the