Wednesday, December 24th, 2025

Petroleum exploration: 79 percent drilling completes



DAILEKH: Almost 79 percent of the drilling work under the exploration of petroleum products has been completed in Jaljale area of Bhairavi Rural Municipality-1 in the district.

Chief of the Petroleum Project Division under the Department of Mines and Geology Ganesh Nath Tripathi said 79 percent of the drilling work has been completed so far.

Only after drilling up to a depth of 4,000 meters it can be ascertained whether or not there is petroleum products.

Exploration of petroleum products is going on with a grant of Rs 2.5 billion from the Chinese government.

The Division in collaboration with China Geological Survey and Sibu Drilling Engineering Company are continuing the drilling works.

Meanwhile, Chief Minister of Karnali Province Yamlal Kandel made an on-site inspection of the project site and inquired about the progress made in petroleum exploration.

RSS

Publish Date : 14 November 2024 10:50 AM

Early morning chill persists in Kathmandu Valley

KATHMANDU: The Kathmandu Valley recorded the same minimum temperature on

NC holding Central Work Execution Committee meeting today

KATHMANDU: The Nepali Congress (NC) is holding a meeting of

Election 71 days away: Parties intensify PR list preparations

KATHMANDU: With 71 days remaining until the election of members

Three Shocks that Shook the World in 2025

This was the year that the remaining pillars of the

NRB releases today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign currency