Monday, December 15th, 2025

Trishuli bridge closed following cable snapping



NUWAKOT: The bridge over the Trishuli River at Bidur Municipality-6 in Nuwakot district has been completely shut down for both pedestrian and vehicular traffic after one of its four cables snapped, announced Rajan Shrestha, the Mayor of Bidur Municipality.

Constructed nearly 40 years ago during the development of the Devighat Hydropower Centre, the bridge has been a vital link for local communities.

However, concerns over its structural integrity arose when the cable issue was first detected in December last year. Since then, only two-wheel vehicles were permitted to pass through the bridge.

Mayor Shrestha has assured the public that efforts are underway to promptly repair the bridge, aiming to reopen it at the earliest opportunity.

In the meantime, the Municipality has advised drivers and pedestrians to utilize alternative routes via the bridges at Dhunibesi of Simchaur and Devighat.

The closure of the Trishuli bridge at Bidur Municipality-6 has disrupted the direct connection between Bidur Municipality-4 and Mandredhunga of Bidur-6, impacting travel routes leading to Tarakeshwar Rural Municipality and Dhadingbesi.

The closure of the bridge underscores the importance of timely infrastructure maintenance and highlights the challenges posed by aging infrastructure in rural areas.

RSS

Publish Date : 06 April 2024 09:05 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

CPN-UML election battle: Oli and Pokharel camps finalize strategies

KATHMANDU: Competition between CPN-UML Chair KP Sharma Oli and Senior

At least 12 dead in mass shooting at Sydney’s Bondi Beach

SYDNEY: At least 12 people have been killed in a

State responsible for promotion of inclusion: PM Karki

KATHMANDU: Prime Minister Sushila Karki asserted that it is the

UML Convention to extend by 3 days

KATHMANDU: The election schedule for the 11th general convention of