Tuesday, September 29th, 2026

Power leakage control campaign gains momentum in Hetauda



HETAUDA: Power leakage has been reduced to one percent in the Hetauda sub-metropolis area.

Electricity leakage has decreased by 5.67 percent in the fiscal year 2080/81 with the strengthening of Nepal Electricity Authority’s system, including hooking control, improvement in customer billing, long-pending meter change and improvement in electricity meter reading.

Chief of NEA’s Hetauda Distribution Centre Shivaram Yadav informed electricity leakage in the Hetauda area has come down to one percent in the fiscal year 2080/81 as compared to 6.67 percent in the last fiscal year.

According to the Office, Rs 229,379 was collected during the fiscal year 2080/81 BS while taking action against the consumers leaking electricity during the campaign.

RSS

Publish Date : 04 September 2024 10:41 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Trucks line up from Kalanki to Balkhu as Prithvi Highway remains blocked

KATHMANDU: Trucks have lined up across Kathmandu after the Prithvi

Russia’s ambassador to Nepal, Alexi, calls on Minister Pokharel

KATHMANDU: Russia’s ambassador to Nepal, Alexi Vladimirovich Surovtsev, today paid

Solar system installed at Timure telephone tower, ending need to transport diesel

KATHMANDU: A solar power system has been installed at Nepal

Two more bodies recovered from Himlung avalanche, death toll reaches four

MANANG: The bodies of two more people who died in