Monday, April 27th, 2026

268 households to be affected from Lower Arun Hydel Project



SANKHUWASABHA: Two hundred and sixty-eight families will be directly affected by the Lower Arun Hydroelectricity Project.

The 669-MW project is located in Sankhuwasabha district of Koshi Province.

According to the draft report, ‘Lower Arun Hydroelectricity Resettlement and Rehabilitation’, proposed by the project developer company Satluj Jal Vidyut Nigam, a hydropower generating company of India, nearly 65 hectares land belonging to the locals is to be acquired for the project.

“Apart from this, 70 hectares land would be forest area and six hectares public land,” said Arun Dhiman, Chief Executive Director of Lower Arun Power Development Company.

The Project stated that the affected locals would be provided around Rs 1.40 billion in compensation.

Satluj, the power developer company, has started consultations with the residents of the project- affected area after the confirmation of the operation of the Project.

The project will not have any reservoir or dam and will be a tailrace development of the Arun-III hydro project, which will mean water re-enters the river for the Lower Arun project.

For this, approximately 17.4 kilometres tunnel will be constructed at Chewabesi of Khandbari Municipality-2.

Satluj is also developing the 900-MW Arun-III Project.

Publish Date : 01 September 2024 09:37 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

7,642 tourists enter Nepal through Kakarbhitta border point last month

JHAPA: Nepal received altogether 7,642 tourists from third countries in the

Indian tourist dies of altitude sickness in Jomsom

MUSTANG: A 63-year-old Indian tourist has died of altitude sickness

Injured mountaineer rescued

MYAGDI: A climber who sustained injuries while descending Dhaulagiri Mountain

TU gives CAN 35-day ultimatum to vacate cricket ground

KATHMANDU: Tribhuvan University has issued a 35-day ultimatum to Cricket