Monday, July 13th, 2026

Two-way traffic resumes on Muglin-Narayangadh road section



MUGLIN: The Muglin-Narayangadh road section, which was blocked by a landslide, is now fully operational.

The landslide occurred near Kalikhola of Ichchakamana rural municipality-5 in Chitwan at 1 am this morning.

The Road Division Office Chitwan swiftly responded to the situation, using an excavator to clear the landslide, allowing the transport service to resume at 3 am.

As a result, the halted vehicles were able to continue their journey once the debris was removed.

It may be noted that the Narayangadh Muglin road section has experienced multiple blockages in the past due to landslides.

Publish Date : 29 July 2023 07:37 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Flood on Modi Khola cuts off road to Ghandruk, damages homes and hydropower plants

KATHMANDU: Flooding in the Modi Khola triggered by heavy rainfall

Bhanu Jayanti to be celebrated nationwide tomorrow

KATHMANDU: The 213th birth anniversary of renowned Nepali poet Bhanubhakta

Health Ministry to launch nationwide mental health awareness campaign

KATHMANDU: The Ministry of Health and Food Safety is set

Flood in Kimrung Khola raises risk for riverside settlements in Kaski

KATHMANDU: Flooding in Kimrung Khola has increased the risk to