Sunday, August 16th, 2026

Two-way traffic resumes on Muglin-Narayangadh road section



MUGLIN: The Muglin-Narayangadh road section, which was blocked by a landslide, is now fully operational.

The landslide occurred near Kalikhola of Ichchakamana rural municipality-5 in Chitwan at 1 am this morning.

The Road Division Office Chitwan swiftly responded to the situation, using an excavator to clear the landslide, allowing the transport service to resume at 3 am.

As a result, the halted vehicles were able to continue their journey once the debris was removed.

It may be noted that the Narayangadh Muglin road section has experienced multiple blockages in the past due to landslides.

Publish Date : 29 July 2023 07:37 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Minister Dr Timilsina inspects disaster-prone settlements in Nuwakot

NUWAKOT: Minister for Information and Communication Dr Bikram Timilsina on

Death toll from Thawang landslide reaches 12

ROLPA: One more dead body was recovered from the landslide occurred

National consensus necessary for the country: Rajendra Lingden

NAWALPARASI: Rastriya Prajatantra Party (RPP) Chair Rajendra Prasad Lingden has

NOC to sell cooking gas at seven locations in Kathmandu Valley on Sunday

KATHMANDU: The Nepal Oil Corporation (NOC) will sell liquefied petroleum