Wednesday, December 24th, 2025

Two motorable bridges constructed over Myagdi river



MYAGDI: Two motorable bridges have been constructed over the Myagdi River, connecting Baranja and Arman of Mangala Rural Municipality with the road network.

The Road Division Office, Baglung constructed the two bridges – one linking Matebagar, Babiyachaur, Ward Number 2 and Pok, Ward Number 5 of Mangala Rural Municipality and the next connecting Phaparkhet, Beni Municipality-4 to Pakher of Mangala Rural Municipality-3.

With the construction of the two bridges, Baranja and Arman, the areas with large geography and settlements in the district have been linked with roadway via the Beni-Darbang road, said Yam Roka, the Ward Chair of Mangala Rural Municipality-3.

More than 2,500 households in Baranja and Arman of Mangala Rural Municipality have benefited from the construction of the two bridges, it is said.

The bridge linking Matebagar and Pok is 80 meters long while the one connecting Phaparkhet and Pakher is 117 meters long.

Both bridges are 11 meters wide.

Both bridges have been constructed at a cost of Rs 220 million. The Road Division Office, Baglung had awarded the contract for the construction of the bridges to Lumbini-Prakritik JV.

Publish Date : 26 April 2023 09:06 AM

Magnetic cards, special lenses used to cheat gamblers at Casino Waldo in Thamel

KATHMANDU: Kathmandu police have uncovered a sophisticated gambling fraud at

Nepali Congress holds central executive meeting amid possible convention delay

KATHMANDU: The Nepali Congress is holding a meeting of its

Political dialogue with parties positive and productive: Law Minister Sinha

KATHMANDU: Minister for Law, Justice and Parliamentary Affairs Anil Kumar

NEPSE inches up by 1.37 points, turnover declines

KATHMANDU: The Nepal Stock Exchange (NEPSE) index edged up by

Will Nepal’s polls be held as planned?

KATHMANDU: With just 71 days remaining for the House of