Monday, August 17th, 2026

Two motorable bridges constructed over Myagdi river



MYAGDI: Two motorable bridges have been constructed over the Myagdi River, connecting Baranja and Arman of Mangala Rural Municipality with the road network.

The Road Division Office, Baglung constructed the two bridges – one linking Matebagar, Babiyachaur, Ward Number 2 and Pok, Ward Number 5 of Mangala Rural Municipality and the next connecting Phaparkhet, Beni Municipality-4 to Pakher of Mangala Rural Municipality-3.

With the construction of the two bridges, Baranja and Arman, the areas with large geography and settlements in the district have been linked with roadway via the Beni-Darbang road, said Yam Roka, the Ward Chair of Mangala Rural Municipality-3.

More than 2,500 households in Baranja and Arman of Mangala Rural Municipality have benefited from the construction of the two bridges, it is said.

The bridge linking Matebagar and Pok is 80 meters long while the one connecting Phaparkhet and Pakher is 117 meters long.

Both bridges are 11 meters wide.

Both bridges have been constructed at a cost of Rs 220 million. The Road Division Office, Baglung had awarded the contract for the construction of the bridges to Lumbini-Prakritik JV.

Publish Date : 26 April 2023 09:06 AM

Two killed, three critically injured as jeep plunges off road in Kavre

KAVRE: Two people were killed and three others critically injured

Court extends detention of journalist Kishor Shrestha by four days

KATHMANDU: The Kathmandu District Court has granted police an additional

Trump says US to scale back South Korea military drills

WASHINGTON DC: US President Donald Trump has said the United

Foreign employment entrepreneurs and govt reach agreement

KATHMANDU: The government and the Nepal Association of Foreign Employment

Nine road sections blocked amid incessant rainfall

KATHMANDU: Nine road sections in various parts of the country