Friday, July 17th, 2026

Blacktopping begins at Khanti-Jomsom road section



JOMSOM: Blacktopping of a road linking Thasang Rural Municipality’s center Khanti and Mustang district headquarters Jomsom has started.

The task of blacktopping the 16.5-km Khanti-Jomsom road section has started through the national pride, Kaligandaki Corridor, Beni-Jomsom Korala Road Project.

Project Chief Jagat Prajapati shared that the contractor Gauri-Parbati JV has started blacktopping of the Khanti-Jomsom road section through asphalt technology.

“Over a kilometer road has been so far blacktopped”, he said, adding, “The contractor now has a stock of bitumen which is sufficient for blacktopping four kilometers road section. The contractor has pledged to arrange additional bitumen and materials to blacktop the section up to Jomsom”.

Blacktopping is being done on the road having a breadth measuring 11 meters. It is being carried out after the expansion of the road and drainage and construction of walls.

It may be noted that the Pappu-Gauri-Parbati-Koshi and Neupane JV was awarded a contract of Rs 996.2 million in early 2073 BS for the road-section blacktopping.

Publish Date : 13 March 2023 13:08 PM

Deuba’s Secretariat refutes rumors of former PM’s injury

KATHMANDU: Former Prime Minister Sher Bahadur Deuba’s Secretariat has dismissed

India unveils first home-built hydrogen-powered train

NEW DELHI: India on Friday introduced its first domestically manufactured

Teacher files petition seeking ban on song from upcoming film ‘Masterni’

KATHMANDU: A teacher has filed a petition at the Ministry

NEPSE surges 79 points on first trading day of new fiscal year

KATHMANDU: The Nepal Stock Exchange (NEPSE) index posted a strong

Oli accuses government of moving towards fascism

KATHMANDU: CPN-UML Chair and former Prime Minister KP Sharma Oli