Tuesday, December 23rd, 2025

Blacktopping begins at Khanti-Jomsom road section



JOMSOM: Blacktopping of a road linking Thasang Rural Municipality’s center Khanti and Mustang district headquarters Jomsom has started.

The task of blacktopping the 16.5-km Khanti-Jomsom road section has started through the national pride, Kaligandaki Corridor, Beni-Jomsom Korala Road Project.

Project Chief Jagat Prajapati shared that the contractor Gauri-Parbati JV has started blacktopping of the Khanti-Jomsom road section through asphalt technology.

“Over a kilometer road has been so far blacktopped”, he said, adding, “The contractor now has a stock of bitumen which is sufficient for blacktopping four kilometers road section. The contractor has pledged to arrange additional bitumen and materials to blacktop the section up to Jomsom”.

Blacktopping is being done on the road having a breadth measuring 11 meters. It is being carried out after the expansion of the road and drainage and construction of walls.

It may be noted that the Pappu-Gauri-Parbati-Koshi and Neupane JV was awarded a contract of Rs 996.2 million in early 2073 BS for the road-section blacktopping.

Publish Date : 13 March 2023 13:08 PM

Imports worth Rs 359 billion enter Nepal through Birgunj customs in five months

BIRGUNJ: Goods and commodities worth Rs 359.23 billion have been

Pokhara Metropolis to remove roadside workshops, garages from major roads

POKHARA: Pokhara Metropolitan City has announced a plan to remove

Rabi Lamichhane–Balen Shah meeting sparks speculation of political alignment

KATHMANDU: A meeting between Rastriya Swatantra Party (RSP) Chair Rabi

UML holds nationwide joint meeting to disseminate message of 11th national convention

KATHMANDU: The CPN-UML is holding a joint meeting of all

Preparations underway for Budhigandaki ‘A’ and ‘B’ hydropower projects

GORKHA: Preparatory work has begun for the construction of the