Friday, December 27th, 2024

Hetauda-Bharatpur transmission line comes into operation


10 July 2023  

Time taken to read : 3 Minute


  • A
  • A
  • A

BHARATPUR: The Hetauda-Bharatpur 220 kV transmission line has come into service.

This transmission line is considered important for the smooth supply of power to Makawanpur and Chitwan, among other districts. The Hetauda-Bharatpur section is part of the Hetauda-Bharatpur-Bardaghat Transmission Line Project.

Nepal Electricity Authority (NEA) has brought the 73 kilometres long circuit of the 220 kV double-circuit transmission line into operation, charging it with the 132 kV for the time being.

The 220 kV transmission line from Chaukitol of Hetauda Sub-Metropolitan City, Makawanpur to Aanptaari of Bharatpur Metropolitan City, Chitwan has been charged in the 132 kV, it is stated.

Around 170 megawatts of power can be transmitted to and fro Hetauda and Bharatpur with the operation of the Hetauda-Bharatpur section of the transmission line. Only 90 megawatts of power were being transmitted to and from Hetauda and Bharatpur from the existing old 132 kV transmission line.

The power supply would be easier in the areas with the coming into service of the Hetauda-Bharatpur section of the transmission line.

The Hetauda-Bharatpur-Bardaghat Transmission Line Project has been started aiming to strengthen and make reliable the transmission lines within Nepal and for transmitting the power generated from hydropower projects constructed in the western region.

The Project was initiated in 2008 with the investment of the Government of Nepal and NEA, and a concessional loan from the World Bank. Construction works had been started dividing the Project into two sections – Hetauda-Bharatpur and Bharatpur-Bardaghat.

The construction of the project was affected due to various reasons as obstruction by local people, problems in land acquisition, delays related to the use of forest land and cutting down trees, and the poor performance of the construction company.

The remaining works of the project were moved ahead with the government and NEA’s investments after the World Bank withdrew from the project in 2021.

RSS

Publish Date : 10 July 2023 20:33 PM

Wildlife rescue, treatment and rehabilitation centre established

UDAYPUR: A wildlife rescue, treatment and rehabilitation centre has been

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

Today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank has published the foreign exchange rates

Oli’s autocratic actions undermine democracy: Bhim Rawal

KATHMANDU: Former Vice Chairman Dr. Bhim Rawal, who has dedicated

Last rites of India’s former PM Singh to be held on Saturday

NEW DELHI: The last rites of former Prime Minister Dr