Monday, March 3rd, 2025

Embankment to stop flood-induced damage from Doda river


08 January 2023  

Time taken to read : < 1 Minute


  • A
  • A
  • A

MAHENDRANAGAR: An embankment is being constructed to control the erosion by the Doda River in Laljhadi Rural Municipality-3.

The People’s Embankment Office, Mahendranagar, is constructing a 1,120-meter-long embankment along the Doda River at a cost of Rs.59.1 million.

Information Officer, Arun Kumar Shah, said that the embankment construction will be carried in three sections, which will be completed within the current financial year.

Tikaram Chaudhary, the ward chair of Ward No. 3 of the rural municipality, said after the construction of embankment, four hundred families from Nandgaon, Kanj, Kaswa etc. will be protected from the danger posed by the river every monsoon.

He also said that the embankment should be expanded further to protect the rural municipality by making a master plan for it.

RSS

Publish Date : 08 January 2023 11:38 AM

Foreign Ministry appoints govt representative to oversee NRNA Unity Convention

KATHMANDU: The Ministry of Foreign Affairs has formally supported the

Bidya Devi Bhandari’s return to politics gains momentum as she appears with PM Oli

KATHMANDU: Former President Bidya Devi Bhandari, who is making moves

Domestic tourist dies of pneumonia while visiting Rara

MUGU: A domestic tourist visiting Rara Lake, one of Nepal’s

Operator of illegal hospital arrested in Rautahat

RAUTAHAT: Police have arrested Rajan Sah, the operator of the

NC’s Min Bishwakarma questions viability of govt ordinances

KATHMANDU: Nepali Congress central member Min Bahadur Bishwakarma stated that