Saturday, September 12th, 2026

Dumre-Besisahar road resumes operation



LAMJUNG: The Dumre-Besisahar road section which has been obstructed since last night due to dry landslide has come to regular operation.

With the removal of landslide debris at Besisahar Rural Municipality-1, Udipur Deurali Danda, the obstructed road section has come to operation since this morning.

An alternative road was opened here when landslides recurrently disrupted traffic along the road section last year.

It may be noted that the landslide had demolished a cemented bridge on the road last year.

Police Inspector at the District Police Office, Lamjung, Jagadish Regmi informed that vehicular movement along the road stretch has become smooth after the removal of landslide with the use of dozers.

Publish Date : 03 March 2023 12:01 PM

Three unlicensed guns found in forest; woman arrested with drugs

BAGLUNG: A police patrol team recovered three unlicensed guns from

Seven bodies recovered from Upper Trishuli-1 hydropower project

RASUWA: Seven bodies have been recovered from the flood-damaged Upper

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of

Nepal elect to bat first against UAE in ACC Premier Cup final

KATHMANDU: Nepal won the toss and elected to bat first

Process to evict squatters from Pokhara Bus Park area to resume tomorrow

POKHARA: Pokhara Metropolitan City is preparing to resume the process