Monday, March 10th, 2025

Bensishahar-Chame road to close for 15 days


26 February 2022  

Time taken to read : < 1 Minute


  • A
  • A
  • A

LAMJUNG: The Bensishahar-Chame road linking Lamjung and Manang district will remain closed on March 4-19.

The road will remain closed for the construction of culverts at Timang Chhahara in Naso Rural Municipality-9 in Manang district, said sub engineer at the Bensishahar-Chame road project, Hari Shrestha.

Two culverts will be constructed in the area, he said, adding that the project has been initiated after a wooden bridge in the area has been damaged.

Publish Date : 26 February 2022 11:13 AM

Unified Socialist calls for exposing former King’s ‘wrongdoings’

KATHMANDU: The CPN (Unified Socialist), led by Madhav Kumar Nepal,

Banking sector profit sees 31.12% growth, led by commercial banks

KATHMANDU: The banking sector in Nepal has witnessed a notable

NEPSE falls by 20.68 points, trading volume also down

KATHMANDU: The Nepal Stock Exchange (NEPSE) witnessed a significant drop

Foreign Minister leaves for India on religious and diplomatic visit

KATHMANDU: Foreign Minister Dr. Arzu Rana has departed for India

Sher Bahadur Deuba downplays royalist demonstration

KATHMANDU: Sher Bahadur Deuba, President of the ruling Nepali Congress,