Sunday, December 21st, 2025

Traffic resumes on Bhaise-Bhimfedi road section



KATHMANDU: The Bhaise-Bhimphedi road section, which remained blocked due to the landslide, has resumed operations.

According to the Area Police Office, Bhimphedi, the road had been blocked due to landslide in Pandrang of Bhimphedi Rural Municipality-4 since last night.

Similarly, the short route connecting Hetauda-Bhimphedi to Kathmandu has not been able to operate on the Sisneri road section yet. According to the Bhimfedi Police, the landslide is being removed for the resumption of traffic.

The road has been blocked due to repeated landslides along with rain on the road section from Hetauda to the federal capital Kathmandu.

Publish Date : 18 June 2022 10:19 AM

Construction of Buddhist Stupa completed in Bhojpur’s Panchdhare

BHOJPUR: The construction of a Buddhist stupa in Bhojpur’s Panchdhare,

JSP-N’s Ram Ashish Yadav elected Speaker of Madhesh Provincial Assembly

KATHMANDU: Ram Ashish Yadav of Janata Samajwadi Party Nepal (JSP-N)

Rabi lashes out at Congress and UML: Those who drank children’s blood should not lecture us

KATHMANDU: Rastriya Swatantra Party (RSP) chair Rabi Lamichhane has accused

NC recommends three names from Kalikot

KALIKOT: The Nepali Congress District Working Committee in Kalikot has

NEPSE index drops by 19 points

KATHMANDU: The Nepal Stock Exchange (NEPSE) index experienced a double-digit