Thursday, November 21st, 2024

RCC bridge constructed over Phedi rivulet


14 March 2022  

Time taken to read : < 1 Minute


  • A
  • A
  • A

DAMAULI: Construction of a Reinforced Concrete Cement (RCC) bridge over the Phedi rivulet linking two municipalities of Tanahun district has been completed.

The bridge has been constructed over the rivulet connecting Bhimad municipality and Rishing rural municipality of the district. As shared, the bridge construction had started on January 2021.

Locals have been elated with the construction of the bridge in a place where it was difficult to cross the rivulet during the rainy season.
The bridge having a length of 25 meters and a breadth of 8.4 meters has been constructed at the investment of over Rs 35.83 million. Gandaki Province Ministry of Physical Infrastructure had invested for the bridge construction.

Over a thousand of people from Bhimad and Rishing have been benefitted after the construction of a RCC bridge over the rivulet.

Publish Date : 14 March 2022 07:40 AM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

People’s representatives should be responsible for public service: Prachanda

DAMAULI: CPN (Maoist Centre) Chairperson and former Prime Minister Pushpa

Minister Yadav directs smooth distribution of Melamchi Water in Kathmandu

KATHMANDU: Minister for Water Supply, Pradip Yadav, has instructed daily

NC to discuss current economic situation and way forward

KATHMANDU: The Nepali Congress is to hold a discussion on

Private medical colleges, govt. hospitals directed to make service fees public

KATHMANDU: The Ministry of Health and Population has asked the