Sunday, June 14th, 2026

RCC bridge constructed over Phedi rivulet



DAMAULI: Construction of a Reinforced Concrete Cement (RCC) bridge over the Phedi rivulet linking two municipalities of Tanahun district has been completed.

The bridge has been constructed over the rivulet connecting Bhimad municipality and Rishing rural municipality of the district. As shared, the bridge construction had started on January 2021.

Locals have been elated with the construction of the bridge in a place where it was difficult to cross the rivulet during the rainy season.
The bridge having a length of 25 meters and a breadth of 8.4 meters has been constructed at the investment of over Rs 35.83 million. Gandaki Province Ministry of Physical Infrastructure had invested for the bridge construction.

Over a thousand of people from Bhimad and Rishing have been benefitted after the construction of a RCC bridge over the rivulet.

Publish Date : 14 March 2022 07:40 AM

One hundred kilograms of marijuana seized in Parsa

KATHMANDU: A joint team of the District Police Office, Parsa,

Kathmandu Metropolitan City to launch ‘Gen Z, Gen Alpha’ special program

KATHMANDU: The Kathmandu Metropolitan City (KMC) has announced plans to

RSP Convention: Hundreds eye central committee as Secretariat race takes shape

KATHMANDU: As the Rastriya Swatantra Party (RSP) holds its maiden

HoR to hold ministry-wise budget discussions on June 15 and 16

KATHMANDU: The House of Representatives (HoR) is scheduled to hold

Embassy of Pakistan and PNAN Organize free medical camp in Kathmandu

KATHMANDU: The Embassy of Pakistan, in collaboration with the Pakistan