Tuesday, June 9th, 2026

2,200 trees chopped down to widen Jamune-Kotre section of Prithvi Highway



TANAHUN: As many as 2,200 trees have been axed from Jamune to Kotre in Tanahun district along the Prithvi Highway.

The trees on both sides of the road from Jamune in Myagde Rural Municipality to Kotre in Shukla Gandaki Municipality were cleared in bid to widen the road, Assistant Resident Engineer of Super Vision Consultancy Mohan KC said.

It is said 1,200 more trees are left to fell owing to transmission line of the power supply. He said alignment and maintenance of the route are also taking place.

The width of the road from Khairenitar of Tanahun to Thula bazaar of Pokhara is fixed 46 meters while the width will be half of that in the areas that need filling and 18 meters in the section where cutting is not feasible.

Publish Date : 12 February 2022 21:53 PM

NRB issues foreign currency exchange rates for today

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign exchange

Democracy without deep transformation: Nepal’s political reality

Nepal is a democracy with elections, a constitution, federalism, and

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Minister Shrestha instructs NEA to immediately collect electricity dues

KATHMANDU: The Ministry of Energy, Water Resources and Irrigation has

Japanese Ambassador Maeda calls on Foreign Minister Khanal

KATHMANDU: Japanese Ambassador to Nepal Maeda Toru paid a courtesy