Monday, July 6th, 2026

KMC urges people to pass house design within 90 days



KATHMANDU: Kathmandu Metropolitan City (KMC) has urged Kathmanduites to pass the design of the houses and buildings built without completing formal procedures within the metropolitan area within 90 days.

The urban management department of the metropolis has issued a public notice urging people to complete the process within 90 days.

The metropolis has also warned that such structures built without completing the process will face consequences.

If the map is not passed within 90 days, action will be taken according to the Local Government Operation Act 2074 and prevailing building construction standards, codes and procedures, and the decision of the office, the metropolis said.

Publish Date : 08 September 2022 09:45 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Minister Shrestha worries over missed target for Sikta Irrigation Project

KATHMANDU: Minister for Energy, Water Resources and Irrigation, Biraj Bhakta

Concrete bridge in Sawakhola comes into operation

KHOTANG: A concrete bridge has been constructed over Sawakhola at

One killed, 11 injured in road accident in Dolpa

KARNALI: One person died and 11 others were injured in

Govt plans to develop Korala road into tourist highway

MUSTANG: Minister for Culture, Tourism and Civil Aviation Khadak Raj