Tuesday, March 24th, 2026

Obstructed Prithivi Highway reopens



DAMAULI: The obstructed Prithivi Highway has resumed following the removal of debris deposited by landslides at two places in Byas Municipality-12. The road was obstructed by landslides in the municipality today morning.

Following this, stuck passengers and vehicles have headed to their destinations, said Inspector Raj Kumar Sunar, adding that however, landslip risks at the area still persisted as rain continued. A team of security personnel has been kept on standby in view of the possibility of a landslide, he said.

Similarly, the obstructed road at Gunadi of Myagde Rural Municipality-1 has reopened following the clearance of the road obstructed by a landslide. Following this, one-way traffic has been allowed. The removal of debris was underway to fully resume the road, said the police. “Continuous rain has affected repair,” they said.

Publish Date : 07 October 2022 14:52 PM

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

Two killed in Bolero accident in Doti

DOTI: Two people died in a Bolero jeep accident on

Light rain likely in Koshi, Gandaki and Karnali provinces

KATHMANDU: Nepal is currently under the partial influence of westerly

Trump gives Iran “One More Chance” at peace amid conflicting reports on US-Iran talks

WASHINGTON DC: President Donald Trump claimed that the United States

Minimum temperature rises in Kathmandu Valley

KATHMANDU: The minimum temperature in the Kathmandu Valley has increased,