Sunday, December 21st, 2025

Beni-Jomsom road section resumes



BENI: The Beni-Jomsom road section along the Kaligandaki Corridor which had remained closed for three days has resumed from last evening.

With the resumption of vehicular movement, the vehicles have moved to their destinations, Supervisor of Beni-Jomsom Road section Indra Singh Sherchan said.

The road section was obstructed from Monday after a landslide at Kavrebhir caused due to torrential rain.

Likewise, the road near Ghopteodhar of the same site along the borderland of Myagdi and Mustang districts had collapsed, adding further owes to the vehicular movement.

It is said maintenance of 50 metres road was completed on Wednesday and Thursday with the mobilisation of construction equipment and human resources, Sherchan added.

During the monsoon season, the Myagdi section of the highway is at high risk of frequent disruptions.

RSS

Publish Date : 05 August 2022 09:22 AM

JSP-N’s Ram Ashish Yadav elected Speaker of Madhesh Provincial Assembly

KATHMANDU: Ram Ashish Yadav of Janata Samajwadi Party Nepal (JSP-N)

Rabi lashes out at Congress and UML: Those who drank children’s blood should not lecture us

KATHMANDU: Rastriya Swatantra Party (RSP) chair Rabi Lamichhane has accused

NC recommends three names from Kalikot

KALIKOT: The Nepali Congress District Working Committee in Kalikot has

NEPSE index drops by 19 points

KATHMANDU: The Nepal Stock Exchange (NEPSE) index experienced a double-digit

More people in Chitwan taking non-resident citizenship

CHITWAN: The number of people acquiring non-resident Nepali citizenship in