Sunday, November 24th, 2024

Removal of landslide debris begins in Rasuwa


05 January 2022  

Time taken to read : < 1 Minute


  • A
  • A
  • A

RASUWA: Debris of landslide that blocked the Syafrubsi-Rasuwagadhi road section since last Tuesday is being removed now.

The task of road clearance is taking place with support from local administration. Heavy equipment such as excavators are being used to remove the debris since this morning.

According to Chief District Officer of Rasuwa Nawaraj Jaisi, excavators of Division Road Office and Hydropower Project are being used to clear off the road and resume the traffic operations.

Likewise, security personnel have been mobilized to ensure safe mobility of the pedestrians along the landslide-disrupted road.
Technicians informed that it may take two days to remove the landslide debris since the task demands higher level of precaution and safety measures.

With the disruption of highway, the containers on the way to Nepal from China have been stranded off the road in Timure region.

Publish Date : 05 January 2022 14:54 PM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Knee surgery performed on 34 patients

KATHMANDU: The Jorpati-based Nepal Orthopedic Hospital has performed knee surgery

‘Infrastructure and public awareness must for disaster risk reduction’

KATHMANDU: Japanese Ambassador to Nepal, Kikuta Yutaka said the disaster-induced

Country’s trade deficit exceeds Rs 460 billion in four months

KATHMANDU: Country’s trade deficit has crossed Rs 460 billion in

31 injured in bus accident on East-West highway in Kanchanpur

DODHARA CHANDANI: A passenger bus met with an accident at